A cement industry case study

 

This paper analyses a case study of a plant in the UK, operating a pre-calciner type kiln commissioned in 1986. Production data was analysed to examine the day-to-day variation in the fuel-derived CO2 emissions, in order to estimate the potential for operational improvement. Optimising the factors affecting performance was predicted to reduce energy consumption by 8.5% and CO2 emissions by 19.5%.